Tariff revision proposal for the FY 2024-25 to FY 2026-27
Tariff revision proposal
9496001912
IVR | | | SMS
9496010101
Emergency/Accidents
0471-2555544
Landline
1912
Toll free number
Visit
Customer Portal
The Facts
Newsletter
FEATURED DOWNLOADS
-
Applications are invited by Center for Management Development(CMD) from qualified and experienced candidates for appointment on contract basis for a 24x7 Centralized Call Centre 1 File
NO:CRA/01/2024 | Date: 2024-10-23
-
Ad Hoc Select List of Officers in the Electrical Wing for the year 2024 -Approved 1 File
KSEBL/SEC/ESTT/S15/2024- S3 | Date: 2024-10-05
-
Transfer and posting of Executive Engineers(Ele) Grievance Redressal 1 File
B.O. (FTD) No.422/2024 (Est.IIT&P/EE (Ele)2024) | Date: 2024-10-05
-
Transfer and posting of Executive Engineers(Ele) 1 File
ESTT IIIOLGTH-2024/T&P/EE-Ele | Date: 2024-09-13
-
Public hearing on tariff revision 1 File
KSEBL/TRAC /G/Tariff Revision / 2024-25/656 | Date: 2024-09-07
-
Tariff revision proposal for the FY 2024-25 to FY 2026-27 1 File
1 | Date: 2024-08-02
-
Power Availability Report 1 File
1 | Date: 2024-05-31
-
Actions taken to cope with heavy fall in power demand due to unexpected rains in May 1 File
Vol II Issue 9 | Date: 2024-05-25
-
Annual Administration Report 7 Files
Annual Administration Report | Date: 2024-05-25
-
Negative propaganda on media regarding KSEBL EV Charging Station 1 File
Volume II - Issue 3 | Date: 2024-03-25
-
Selected List - Customer Relation Assistant at CCC 3 Files
Selection list/OCRA | Date: 2024-03-23
-
Distribution Cost Data 4 Files
Cost data | Date: 2024-02-08
-
Operation and Maintenance Manual for KULAMAVU SADDLE DAMS 1 File
O&M - 24 | Date: 2024-01-30
-
Operation and Maintenance Manual for VELLATHOOVAL DIVERSION WEIR 1 File
O&M - 23 | Date: 2024-01-30
-
Operation and Maintenance Manual for KUTTIYAR DIVERSION WEIR 1 File
O&M - 25 | Date: 2024-01-27
Sale of old and unserviceable scrap materials kept at various Substations under Transmission Circle Thodupuzha
Date: 2024-11-27
Normal Tender
Scrap Tender
PAC below 5 Lakhs
PMU/KKD/e TENDER/ 16 /24-25 Dt 26-11-2024
RECONDUCTORING 11 kV OH LINE WITH COVERED CONDUCTOR ALONG MULANKADAVU-MELEPONNANKAYAM ROAD
Date: 2024-11-27
E-Tender
Work Tender
PAC between 5 Lakhs and 50 Lakhs
PMU/ TDPA/E tender/26/2024-25/ dated 22.11.2024
Constructing 2km HT Line and erecting a transformer at Nadakkal Padi under Ele. Section Erattayar
Date: 2024-11-27
E-Tender
Work Tender
PAC between 5 Lakhs and 50 Lakhs
ശബരിമല മണ്ഡല മകരവിളക്ക് ഒരുക്കങ്ങൾ പൂർത്തിയാക്കി കേരള സ്റ്റേറ്റ് ഇലക്ട്രിസിറ്റി ബോർഡ് ലിമിറ്റഡ്
14-Nov-2024
ശബരിമല സന്നിധാനം, പമ്പ, നിലക്കൽ എന്നിവിടങ്ങളിലുള്ള ലൈൻ, ട്രാൻസ്ഫോർമർ അറ്റകുറ്റപ്പണികൾ എന്നിവ വൈദ്യുതി മന്ത്രിയുടെ നിർദ്ദേശപ്രകാരം കെഎസ്ഇബി ഡയറക്ടർ (വിതരണ വിഭാഗം), ചീഫ് എൻജിനീയർ (ഡിസ്ട്രിബ്യൂഷൻ സൗത്ത്), പത്തനംതിട്ട ഇലക്ട്രിക്കൽ ഡെപ്യൂട്ടി ചീഫ്..
പിഎം സൂര്യഘർ പദ്ധതിയിൽ ചരിത്രം കുറിച്ചു് കേരളം., രാജ്യത്ത് രണ്ടാം സ്ഥാനത്ത്
08-Nov-2024
കേന്ദ്ര സര്ക്കാര് 78,000 രൂപ വരെ സബ്സിഡി നല്കുന്ന പി എം സൂര്യഘർ പദ്ധതിയിൽ കേരളത്തിന് അഭിമാനപൂർവ്വമായ നേട്ടം. കേന്ദ്ര സര്ക്കാരും റിന്യൂവബിള് എനർജി കോര്പ്പറേഷനും കൂടി പ്രസിദ്ധീകരിച്ച ഏറ്റവും പുതിയ പട്ടിക..
അപ്പര് ചെങ്കുളം ജലവൈദ്യുത പദ്ധതി (24 MW / 53.22 Mu) –നിര്മ്മാണോദ്ഘാടനം ഇന്ന് വൈദ്യുതി മന്ത്രി കെ. കൃഷ്ണന്കുട്ടി നിര്വഹിക്കും
23-Oct-2024
സംസ്ഥാനത്തെ വര്ദ്ധിച്ചു വരുന്ന വൈദ്യുതി ഉപഭോഗം നിറവേറ്റാനും ചെലവു കുറഞ്ഞ ജലവൈദ്യുത ഉത്പാദനം വര്ദ്ധിപ്പിക്കാനും ലക്ഷ്യമിട്ട് കേരള സ്റ്റേറ്റ് ഇലക്ട്രിസിറ്റി ബോര്ഡ് ലിമിറ്റഡ് നടപ്പാക്കാനുദ്ദേശിക്കുന്ന പദ്ധതിയാണ് 24 മെഗാവാട്ട് സ്ഥാപിതശേഷിയുള്ള അപ്പര്ചെങ്കുളം ജലവൈദ്യുത..
കെ.എസ്.ഇ.ബി. ഓഫീസുകള്ക്കും നാളെ അവധി
10-Oct-2024
നവരാത്രി ആഘോഷങ്ങളുടെ ഭാഗമായി കേരള സര്ക്കാര് പ്രഖ്യാപിച്ച 11.10.2024-ലെ അവധി കെ.എസ്.ഇ.ബി. കാര്യാലയങ്ങള്ക്കും ബാധകമായിരിക്കും. ക്യാഷ് കൌണ്ടറുകളും പ്രവര്ത്തിക്കില്ല. ഓണ്ലൈന് മാര്ഗ്ഗങ്ങളിലൂടെ വൈദ്യുതി ബില് അടയ്ക്കാന് കഴിയും.
“കെ എസ് ഇ ബി മീറ്റർ വാടകയിലൂടെ ഉപഭോക്താക്കളെ പിഴിയുന്നു” എന്ന തലക്കെട്ടില് കേരള കൌമുദി ദിനപത്രം പ്രസിദ്ധീകരിച്ച വാര്ത്ത അടിസ്ഥാന രഹിതം : കെ.എസ്.ഇ.ബി.
10-Oct-2024
“കെ എസ് ഇ ബി മീറ്റർ വാടകയിലൂടെ ഉപഭോക്താക്കളെ പിഴിയുന്നു” എന്ന തരത്തില് കേരള കൌമുദി ദിനപത്രം പ്രസിദ്ധീകരിച്ച വാര്ത്ത ഏകപക്ഷീയവും തെറ്റിദ്ധാരണാജനകവുമാണ്. സിംഗിൾ ഫെയ്സ് മീറ്ററിന് ആറു രൂപയും ത്രീ..
‘കെ.എസ്.ഇ.ബി.ക്കാര്ക്ക് ഷട്ടില് കളിക്കാന് 35 ലക്ഷത്തിന്റെ കോര്ട്ട്; ചോരുന്നത് നാട്ടുകാരുടെ കീശ’ എന്ന തലക്കെട്ടില് ഒരു മാധ്യമം പ്രസിദ്ധീകരിച്ച വാര്ത്ത വസ്തുതാവിരുദ്ധം: കെ.എസ്.ഇ.ബി.
08-Oct-2024
‘കെ.എസ്.ഇ.ബി.ക്കാര്ക്ക് ഷട്ടില് കളിക്കാന് 35 ലക്ഷത്തിന്റെ കോര്ട്ട്; ചോരുന്നത് നാട്ടുകാരുടെ കീശ’ എന്ന തലക്കെട്ടില് ഒരു മാധ്യമം പ്രസിദ്ധീകരിച്ച വാര്ത്ത വസ്തുതാവിരുദ്ധം: കെ.എസ്.ഇ.ബി. കെ എസ് ഇ ബി ലിമിറ്റഡിൻ്റെ കോതമംഗലം..
ഉപഭോക്താക്കളുടെ പ്രതീക്ഷയ്ക്കനുസൃതമായി സേവന നിലവാരം ഉയർത്തണം : വൈദ്യുതി മന്ത്രി കെ. കൃഷ്ണൻകുട്ടി
02-Oct-2024
സേവന നിലവാരം സംബന്ധിച്ച് ഉപഭോക്താക്കളുടെ പ്രതീക്ഷ ഉയരുന്നതിനനുസരിച്ച് കെ എസ് ഇ ബി ജീവനക്കാരുടെ പ്രവര്ത്തന നിലവാരവും ഉയരേണ്ടതുണ്ടെന്ന് വൈദ്യുതി വകുപ്പ് മന്ത്രി കെ. കൃഷ്ണൻകുട്ടി പറഞ്ഞു. കെ എസ് ഇ ബി..
കേരളത്തിന് കേന്ദ്രം 177 മെഗാവാട്ട് വൈദ്യുതി അനുവദിച്ചു.
29-Sep-2024
കേരളത്തിന് 177 മെഗാവാട്ട് വൈദ്യുതി ലഭ്യമാക്കാൻ കേന്ദ്ര ഊർജ്ജ മന്ത്രാലയം ഉത്തരവിട്ടു. നാഷണൽ തെർമൽ പവർ കോർപ്പറേഷൻ്റെ ബാർഹ് 1 & 2 നിലയങ്ങളിൽ നിന്നാണ് യഥാക്രമം 80 മെഗാവാട്ട്, 97 മെഗാവാട്ട്..
ഉപഭോക്തൃ സൌഹൃദമാക്കാന് പുത്തന് ചുവടുവയ്പ്പുമായി കെ.എസ്.ഇ.ബി.
26-Sep-2024
ഉപഭോക്താക്കൾക്ക് കൂടുതൽ മെച്ചപ്പെട്ട സേവനം സമയബന്ധിതമായി പ്രദാനം ചെയ്യുക, ഉപഭോക്താക്കളുമായുള്ള ഹൃദയബന്ധം കൂടുതൽ ഊഷ്മളവും വിശ്വസ്തവുമാക്കി മാറ്റുക തുടങ്ങിയ ലക്ഷ്യങ്ങളോടെ വിവിധങ്ങളായ ഉപഭോക്തൃ സൗഹൃദ പരിപാടികളുമായി കെ എസ് ഇ ബി. ആദ്യപടിയെന്നോണം..
പെരുമാറ്റദൂഷ്യത്തിന് മൂന്ന് പേർക്ക് സസ്പെൻഷൻ.
24-Sep-2024
കെ.എസ്.ഇ.ബി. തലയാഴം ഇലക്ട്രിക്കല് സെക്ഷനിലെ ഇലക്ട്രിസിറ്റി വര്ക്കര്മാരായ അഭിലാഷ് പി.വി., സലീംകുമാര് പി.സി., ചേപ്പാട് ഇലക്ട്രിക്കല് സെക്ഷനിലെ ഇലക്ട്രിസിറ്റി വര്ക്കറായ സുരേഷ് കുമാര് പി. എന്നിവരെ പെരുമാറ്റ ദൂഷ്യത്തിന് സർവ്വീസിൽ നിന്നും സസ്പെൻഡ്..
What is fuel surcharge ?
Central Electricity Act, 2003, Section 62(4), provides for levying fuel surcharge on variations in electricity prices due to fluctuations in fuel prices. The National Tariff Policy stipulates that the uncontrollable..
What is Additional Cash Deposit (ACD)?
According to Section IV, Clause 67 of the Kerala Electricity Supply Code 2014, rules for maintaining Security Deposit for electricity charges and meter are described as follows: Clause 67. Security..
Pay your electricity bills using Consumer number as Account number
KSEBL has introduced a new payment system where low tension electricity consumers can pay their electricity bill using their 13-digit consumer number as a virtual account number. This system has..
MILESTONES
Commissioning of Tottiyar Hydro Electric Project.
The 40 MW Tottiyar Hydroelectric Project was inaugurated on October 28, 2024, at the Lower Periyar Hydroelectric Project Courtyard by Honorable Chief Minister Mr. Pinarayi Vijayan, who dedicated it to the nation. The project utilizes water from the Deviyar, a tributary of the Periyar River. It consists of two electric generators with capacities of 30 MW and 10 MW, respectively. The plant is expected to generate 99 million units of electricity annually.
The power source for this project is a dam constructed across the Deviyar at Walara, along with an associated reservoir. The dam, which is 222 meters long and 7.5 meters high, stores water that flows through a 60-meter-long canal and then through a 199-meter-long tunnel to reach a 1,252-meter-long penstock. Water rushing through the penstock from a height of 474.3 meters drives the vertical shaft Pelton turbines located in the powerhouse.
The Thottiyar Powerhouse is situated on the banks of the Periyar River in Mannakandam village, within the Devikulam taluk of Neendapara. The construction is designed so that the water, after generating electricity, is discharged back into the Periyar River. The total construction cost of the Tottiyar project is Rs 188 crores. The electricity generated from the two generators at Tottiyar is at a voltage of 11 kV, which is then transformed to 220 kV before being transmitted to the switchyard and subsequently to the Lower Periyar-Chalakkudy 220 kV line.
Commissioning of Peruvannamoozhi Small Hydropower Project
The Peruvannamoozhi Small Hydropower Project was presented to the nation by Hon. Chief Minister Mr. Pinarayi Vijayan on February 26, 2024. This project, with a capacity of 6 MW, has been constructed in the Chakkittapara and Chempanoda villages of Koyilandi taluk in the Kozhikode district. The objective of the project is to generate 24.70 million units of electricity per year by utilizing the excess water from the Peruvannamoozhi reservoir of the Kuttyadi Irrigation Project, following the fulfillment of irrigation and drinking water needs. The Peruvannamoozhi project, which was constructed with an investment of Rs 81.47 crore, is also the 10th small hydropower project in the Kozhikode district.
2024Implementation of Cloud Telephony Services
Revolutionizing Customer Service with Cloud Telephony at KSEBL.
2023Setting up of RE Data Centre
For Monitoring and Scheduling of Renewable Energy in the State KSEBL established a Renewable Energy Data Centre at CE (REES) Office. It was established on 03.08.2021.The Project cost is Rupees Seventy Lakhs only.
Introduction of Service At Doorsteps
As part of improving the ease of life and customer service,KSEBL has introduced a flagship project ““Services at doorsteps” as a pilot project under Electrical Circle, Palakkad from 01.10.2020 onwards.
2021Commissioning of first Floating Solar Project in Banasura Sagar
The first Floating Solar Project was commissioned in Banasurasagar on 31.03.2019 which has a capacity of 500 KWp.
2019Kerala becomes India's first state to have 100% households, electrified.
Kerala became India's first 100% households electrified state, with Chief Minister Pinarayi Vijayan declaring the state as 100% electrified on 29th day of may in 2017.
2017Commissioning of first Ground Mounted Solar Power Plant at Kanjikode
The first Ground Mounted Solar Power Plant of KSEBL was commissioned on 20.08.2015 at Kanjikkode. It has a capacity of 1MWp.
2015Formation of Centralised Customer Care and attached 24x7 Call Center
A Centralised Customer Care Centre (CCC) with an attached Call Centre was established under RAPDRP scheme Part A, started functioning at Vydyuthi Bhavanam, Pattom with a single BSNL PRI line.
2014Formation of KSEB Limited:
The Kerala State Electricity Board Limited is the successor entity of Kerala State Electricity Board. As per section 172 (a) of the Electricity Act 2003 and as mutually decided by the Government of India and Government of Kerala, KSEB had continued as Transmission utility and Distribution licensee till 24-09-2008.
2013Formation of Model sections:
In order to transform KSEB into a customer-oriented organization and to facilitate a face-lift in the operation of Electrical Section offices, KSEB decided to implement 75 model sections, one in each Electrical Division with effect from 01.06.2009.
2009Formation of Transmission and Distribution Coordination Committee
To minimize the supply interruption, effective utilization of transmission capacity (lines as well as substation), system improvement and to ensure proper cooperation between the Distribution and Transmission wings, the Board has constituted a Circle level Coordination Committee of Transmission and Distribution wings vide B.O.(FM)No.869/2008(DPCIII/T&DCC/2008-09) dtd 05.04.2008.
2008Implementation of new LT billing software - ORUMA
Computerisation Unit has successfully completed the development of new application software for LT billing based on open-source technology.
2008Formation of Consumer Grievance Redressal Forums (CGRF)
The Kerala State Electricity Board Ltd constituted as per BO dated 16.03.2006 - Consumer Grievance Redressal Forums(CGRFs) for each region namely - Southern, Central & Northern.
2006Formation of Transformer Field Repair Unit
Kerala State Electricity Board Ltd formed a district-wise Transformer Field Repair unit on 28.10.2005.
2005Commissioning of Tottiyar Hydro Electric Project.
2024-10-28
The 40 MW Tottiyar Hydroelectric Project was inaugurated on October 28, 2024, at the Lower Periyar Hydroelectric Project Courtyard by Honorable Chief Minister Mr. Pinarayi Vijayan, who dedicated it to the nation. The project utilizes water from the Deviyar, a tributary of the Periyar River. It consists of two electric generators with capacities of 30 MW and 10 MW, respectively. The plant is expected to generate 99 million units of electricity annually.
The power source for this project is a dam constructed across the Deviyar at Walara, along with an associated reservoir. The dam, which is 222 meters long and 7.5 meters high, stores water that flows through a 60-meter-long canal and then through a 199-meter-long tunnel to reach a 1,252-meter-long penstock. Water rushing through the penstock from a height of 474.3 meters drives the vertical shaft Pelton turbines located in the powerhouse.
The Thottiyar Powerhouse is situated on the banks of the Periyar River in Mannakandam village, within the Devikulam taluk of Neendapara. The construction is designed so that the water, after generating electricity, is discharged back into the Periyar River. The total construction cost of the Tottiyar project is Rs 188 crores. The electricity generated from the two generators at Tottiyar is at a voltage of 11 kV, which is then transformed to 220 kV before being transmitted to the switchyard and subsequently to the Lower Periyar-Chalakkudy 220 kV line.
Poll
Rate the Online services provided by KSEBL
Which Online Service do you find the most satisfying?